Heat pumps · UK · Explainer
Heat pump grant: the Boiler Upgrade Scheme
The government’s heat pump grant comes off your quote before you pay. Who qualifies, how much you get, how the claim works and what Scotland offers instead.
Key facts
- The Boiler Upgrade Scheme gives £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air heat pump in England and Wales.1
- Off-gas homes replacing oil or LPG get £9,000 until 31 March 2027.2,3
- The installer applies, and the grant is taken off your quote upfront.1
- Since 28 April 2026 you no longer need an Energy Performance Certificate to apply.1
- In Scotland, Home Energy Scotland offers its own heat pump grant plus an optional interest-free loan.4
On this page
- How much is the heat pump grant?
- Who can get the Boiler Upgrade Scheme?
- Who can’t claim?
- The higher grant for oil and LPG homes
- How the application works
- What you have to do as the property owner
- Can you claim after the heat pump is fitted?
- What the installation must meet
- VAT and loans on top of the grant
- Heat pump grant in Scotland
- Who to contact
- Our verdict
The Boiler Upgrade Scheme, the only heat pump grant most households in England and Wales will ever need to understand, pays £7,500 towards an air source or ground source heat pump and £2,500 towards an air-to-air heat pump.1 If your home is off the gas grid and you are replacing oil or LPG heating, the grant is £9,000 until 31 March 2027.2 Your installer applies, and the money comes off your bill upfront.1 No forms for you to fill in, no cheque to wait for: the grant is a line on the quote, taken off before anything is signed. Scotland has its own grant and loan through Home Energy Scotland; we come to that below.
Our verdict: if you are getting a heat pump in England or Wales, there is no reason not to claim it, and the only way in is an MCS certified installer. If you heat with oil or LPG, the £1,500 extra is worth moving for: get quotes before Christmas so the job is done well inside the deadline.3
How much is the heat pump grant?
The air source heat pump grant is the one most people claim, but the scheme covers four kinds of heating.
| System | Grant | Voucher lasts |
|---|---|---|
| Air source heat pump (air-to-water) | £7,500 | 3 months1 |
| Ground source heat pump, including water source and shared ground loops | £7,500 | 6 months1,3 |
| Air source or ground source, off-gas home replacing oil or LPG | £9,000 until 31 March 2027 | 3 or 6 months1 |
| Air-to-air heat pump, homes only | £2,500 | 3 months1 |
| Biomass boiler, in limited circumstances | £5,000 | 3 months1 |
The £9,000 figure is the standard £7,500 plus an extra £1,500 for oil and LPG homes.3 The scheme itself has been extended to 2030, so only the uplift has a deadline.1
Who can get the Boiler Upgrade Scheme?
The rules are wider than most people expect.
- Where: properties in England and Wales only.1
- What kind of home: owner-occupied homes, homes rented to tenants, second homes, holiday homes and park homes all qualify. Air-to-water and ground source systems can also go into non-residential buildings such as churches and community centres; air-to-air is for homes only.1
- What you are replacing: a fossil-fuel system (gas, oil, LPG or coal) or electric heating without a heat pump, such as storage heaters, electric panel radiators or an electric boiler.1
- How many grants: one per property. Landlords with several properties can apply for each legally separate one.1
- Paperwork: since 28 April 2026 you don’t need an Energy Performance Certificate. If a valid one exists, the installer adds its number; if not, a utility bill or fuel receipt from the last 3 months and photos of the old heating system do the job.1
- Self-builds: eligible for a heat pump, though not for the £9,000 uplift.1
Who can’t claim?
- New homes built by developers.1
- Social housing. A Right to Buy home can qualify once it is privately owned.1
- Homes that already have a heat pump or other low-carbon heating.3
- Hybrid systems that pair a heat pump with a fossil-fuel boiler.3,1
- Homes that have already had a grant for a heat pump or biomass boiler under the scheme, or where the same heat pump has been funded by ECO or another public grant.1
The higher grant for oil and LPG homes
The higher grant started on 21 July 2026 and runs until 31 March 2027.2 It covers air-to-water and ground source heat pumps, and the property has to pass two tests.1
First, it must be off the gas grid. That means no mains gas, no record of a gas meter point at the address (capped or clamped connections count against you), no heat network connection, and not a new build.1
Second, the heating you are replacing must run on oil or LPG.1 A home that fails either test can still get the standard £7,500 if it meets the other rules.1
Air source vouchers last three months.1 That makes January the latest sensible month to have an application in, and December better.
How the application works
- Find an MCS certified installer. The installer must be certified for the technology and belong to an approved consumer code.1 MCS’s search lets you filter for businesses registered for the scheme.5
- Get a quote with the grant deducted. The grant must appear as an upfront discount on your quote.1
- The installer applies. They gather the eligibility details and submit the application to Ofgem.1
- You confirm consent. You confirm to Ofgem that the application was made with your agreement, and Ofgem may contact you to check your identity.1
- Installation and redemption. After the system is installed and commissioned, the installer redeems the voucher. If the system was commissioned first, the application must arrive within 120 days of commissioning.1
One contract trap: you must become the legal owner of the heat pump once it is installed. Hire purchase, conditional sale and consumer hire agreements are not eligible; payment plans where you pay in instalments can be.1
What you have to do as the property owner
The scheme is run through the installer, but a few jobs stay with you. You confirm the eligibility details and make sure what you tell the installer is accurate, you confirm consent to the application, and you answer Ofgem if it asks to verify your identity.1 You also confirm that you received the full grant as an upfront discount on your quote.1
If the old boiler has already gone before the installer arrives, keep evidence of it, such as photos or the last fuel bill. Landlords have one extra duty: telling tenants how the new heating system will affect them.1
Can you claim after the heat pump is fitted?
Yes, within limits. If the system is commissioned before the voucher application, the installer must make the application within 120 days of the commissioning date, and Ofgem will usually take that date from the MCS certificate.1 An installer who is not yet MCS certified can apply only once full certification comes through, and does so at their own risk.1 The safer order is the normal one: application first, installation second.
What the installation must meet
Grant-funded systems must meet MCS standards and minimum efficiency levels, which your installer can explain for the model they propose.3,1 There are size limits too, though few homes come near them: 45kWth for a single system, 70kWth where heat pumps work together, and 300kWth on a shared ground loop.3
VAT and loans on top of the grant
Installed heat pumps are zero-rated for VAT until 31 March 2027; from 1 April 2027 the reduced rate applies.6
For the rest of the bill, the Warm Homes Loan scheme backs loans from participating lenders, with caps of £20,000 for an air-to-water heat pump and £35,000 for ground source, each set before the grant comes off.7 Air-to-air systems can’t be financed through it yet, because MCS has no standard for them to be certified against.7 To see what is left to pay, read our air source heat pump cost guide.
Heat pump grant in Scotland
The Boiler Upgrade Scheme stops at the border.2 In Scotland, the Home Energy Scotland Grant and Loan covers homeowners whose existing property is their only or main home.4
- Heat pump grant: up to £7,500, plus an optional interest-free loan of up to £7,500. Rural and island homes get an extra £1,500 on the grant.4
- What qualifies: the heat pump must provide all of the home’s heating and hot water. Replacing an existing heat pump can get a loan but no grant.4
- Loan terms: an administration fee of 1.5% of the loan, capped at £150, with up to 5 years to repay under £5,000, 10 years from £5,000 to £9,999 and 12 years above £10,000.4
- Timing: funding is first come, first served. Don’t start work before the written offer arrives; you have 14 days to sign it, then nine months to finish the work and claim the money.4
- How to apply: call Home Energy Scotland on 0808 808 2282, or use its online form, and an adviser refers you on.4
Northern Ireland is outside the Boiler Upgrade Scheme too, which covers England and Wales only.2
Who to contact
- Your voucher or application: Ofgem, on 0330 053 2006 or BUS.Enquiry@ofgem.gov.uk.2
- Eligibility and policy questions: the Department for Energy Security and Net Zero, at boilerupgradescheme@energysecurity.gov.uk.2
- The installation itself: MCS, on 0333 103 8130 or hello@mcscertified.com.2
Our verdict
The Boiler Upgrade Scheme is one of the simpler grants in British energy: you choose an installer, they claim, and £7,500 comes off.1 The work for you is choosing the right installer and reading the contract for two things, the grant shown as an upfront discount and ownership of the heat pump passing to you.
Oil and LPG households should treat 31 March 2027 as a real deadline, because the extra £1,500 and the zero VAT rate end on the same day.3,2,6 Everyone else can take their time and get the design right. Our heat pump guide helps you pick the type, and we log every rule change on our rule-changes page.
Products compared

855 × 1,125 × 595 mm
Octopus Energy
Octopus Cosy 6
- Heat output
- 5.6 kW (−5 °C outside, 50 °C flow)1
- Efficiency
- SCOP 3.4 (designed at 50 °C)1
- Noise
- 58 dB(A) sound power (at 55 °C)1
- Size
- 855 × 1,125 × 595 mm1
Price: No published price
Octopus Cosy 6: Where to buy: octopus.energy
as of · octopus.energy
Show all 3 ▸
Octopus Energy
Octopus Cosy 12
- Heat output
- 11.2 kW (−5 °C outside, 50 °C flow)1
- Efficiency
- SCOP 3.9 (designed at 50 °C)1
- Noise
- 61 dB(A) sound power (at 55 °C)1
- Size
- 855 × 1,375 × 595 mm1
Price: No published price
Octopus Cosy 12: Where to buy: octopus.energy
as of · octopus.energy
Vaillant
Vaillant aroTHERM plus
- Noise
- Sound power as low as 54 dB(A); Quiet Mark (not the 10 kW model)2
Price: No published price
Vaillant aroTHERM plus: Where to buy: vaillant.co.uk
as of · vaillant.co.uk
| Product | Heat output | Efficiency | Noise | Size | Price |
|---|---|---|---|---|---|
Octopus EnergyOctopus Cosy 6 |
5.6 kW (−5 °C outside, 50 °C flow)1 | SCOP 3.4 (designed at 50 °C)1 | 58 dB(A) sound power (at 55 °C)1 | 855 × 1,125 × 595 mm1 | No published priceOctopus Cosy 6: octopus.energy |
Octopus EnergyOctopus Cosy 12 |
11.2 kW (−5 °C outside, 50 °C flow)1 | SCOP 3.9 (designed at 50 °C)1 | 61 dB(A) sound power (at 55 °C)1 | 855 × 1,375 × 595 mm1 | No published priceOctopus Cosy 12: octopus.energy |
Vaillant aroTHERM plus |
– | – | Sound power as low as 54 dB(A); Quiet Mark (not the 10 kW model)2 | – | No published priceVaillant aroTHERM plus: vaillant.co.uk |
All data
| Product | Heat output | Efficiency | Noise | Flow temperature | Refrigerant | Size | Warranty | Sizes | Energy class |
|---|---|---|---|---|---|---|---|---|---|
| Octopus Cosy 6 | 5.6 kW (−5 °C outside, 50 °C flow)1 | SCOP 3.4 (designed at 50 °C)1 | 58 dB(A) sound power (at 55 °C)1 | 70 °C max flow1 | R290 (natural refrigerant)1 | 855 × 1,125 × 595 mm1 | 8 years1 | – | – |
| Octopus Cosy 12 | 11.2 kW (−5 °C outside, 50 °C flow)1 | SCOP 3.9 (designed at 50 °C)1 | 61 dB(A) sound power (at 55 °C)1 | 70 °C max flow1 | R290 (natural refrigerant)1 | 855 × 1,375 × 595 mm1 | 8 years1 | – | – |
| Vaillant aroTHERM plus | – | – | Sound power as low as 54 dB(A); Quiet Mark (not the 10 kW model)2 | – | R2902 | – | 2 years, extendable to 7 through approved installers2 | 3.5, 5, 7, 10 and 12 kW2 | A+++2 |
Specifications come from each maker's own product page or datasheet, taken on 14 NOV 2026. Our picks are editorial judgement from those published specs, not test results; we haven't tested the products. – means the maker publishes no price.
Calculators
Heat pump running cost calculator
A heat pump's yearly electricity cost compared with your current heating, and the price after any grant.
Pre-filled from: Ofgem, Department for Energy Security and Net Zero
Open the calculator
Example figures · Difference a year · as of 18 November 2026 SCOP 3.4 −£76 … +£266 a year
Rules and grants in force
Boiler Upgrade Scheme
Ofgem
£7,500 as of
A grant towards replacing a fossil-fuel boiler: £7,500 for an air source or ground source heat pump, £5,000 for a biomass boiler and, since the 2026/27 scheme year, £2,500 for an air-to-air heat pump (homes only). An EPC is no longer needed. The installer applies for the grant.
Official source ofgem.gov.uk
Updated · against ofgem.gov.uk
Boiler Upgrade Scheme: £9,000 for homes replacing oil or LPG
Ofgem
£9,000 as of
Homes off the gas grid in England and Wales that replace oil or LPG heating can get £9,000 towards a heat pump. The higher amount started on 21 July 2026 and runs until 31 March 2027.
Official source ofgem.gov.uk · gov.uk · gov.uk
Updated · against ofgem.gov.uk
Temporary zero rate of VAT on installed heat pumps, solar panels and batteries
HM Revenue & Customs
0% as of
Installed energy-saving materials, including heat pumps, solar panels and batteries, have a temporary zero rate of VAT until 31 March 2027, after which the reduced rate applies.
Official source gov.uk
Updated · against gov.uk
Home Energy Scotland Grant and Loan
Home Energy Scotland
up to £7,500 as of
Homeowners in Scotland can get a grant towards a heat pump, plus an optional interest-free loan. Rural and island homes get a higher grant. The heat pump must provide all of the home's heating and hot water; replacing an existing heat pump gets a loan only. The home must be your only or main residence, funding is first come, first served, and work must not start before the written offer.
Official source homeenergyscotland.org
Updated · against homeenergyscotland.org
Dated rule changes
-
in 133 days
£9,000 heat pump grant for oil and LPG homes ends
The higher Boiler Upgrade Scheme amount for off-gas homes in England and Wales replacing oil or LPG runs until 31 March 2027.
-
in 134 days
VAT on installed heat pumps, solar panels and batteries rises to 5%
The 0% rate on installed energy-saving materials ends on 31 March 2027; from 1 April 2027 they carry the reduced rate of 5%.